Sunday, August 17, 2008

Basement Floor is Poured

On Friday afternoon we went up to the property to get the forms set for theposts on the back of the cabin so that they could be poured withthe basement floor on Saturday. Kody and Mindy slept up there that night in the back of their truck. Can you say frost on the sleeping bag??!!
First thing Sturday morning the pumper truck came to help.
Kent, Kody and Cameron working on the footings for the pillars in back
Josh, Cameron and Randy putting in the rebar for the pillars
Then the floor is started. Thanks to Kent and his crew
for doing such a great job!



We even had enough cement for a cement walkway in front of the basement door.



The finished product!! The main level floor is next. Lumber package will be delivered on Wednesday. Power should also be hooked up this week.