CLICK HERE FOR THOUSANDS OF FREE BLOGGER TEMPLATES »

Friday, March 26, 2010

Working again!

We had the road plowed out about three weeks ago and we've been back to work again!  We got the floor tile laid in the two bathrooms upstairs and also in one of the downstairs bathrooms.  All three bathrooms now have the toilets set and the best news of all . . . . . . water is in the pipes so you can flush and not have to haul water in by the bucketful!!!
Here is a shot of the floor tile.


The cabinet guy (Cameron) got the vanity's installed in the three bathrooms.  This next week they will come and measure for the tub surrounds and the vanity tops.  The doors and drawer fronts will be installed later.

The guy came today and started installing the railing on the 2nd level. 
He got all the posts sets and he measured for the railings to go inbetween each post.
Looking down the stairs.  He builds the sections going in between the posts and them brings them up assembled and installs them.  Won't take long now!